Summary
Behind in my stated estimations, a few things have done this, grouping of assessments in both of my other modules, which works against me as I always have something to hand in, the more hand ins the less study time and more checking work over, backing up, filling forms and etc. Though double projects lack of this has put it at a disadvantage being put to the rear while projects due are done first. Then over the holidays I planned to work off a lot of the backlogged work needed done on the project, however was ill over the later part, so its taken me a while to get back into my pile high of tasks.
Though this bottle neck of work, was a part to blame, a number of problems occurred, the first came when I decided to rethink my idea, once I done that I had to change other components including my proposal.
Difficulty with the design specification and plan, the detailed plan was put on hold until the design specification is handed to the developer, as everything evolves around that task. The design specification is a lot more than I thought, as I knew I had to hand over the layout I wanted, but in order to do that I had to know the exact design in mind, shapes, styles, buttons etc. That’s taken a while.
Though this bottle neck of work, was a part to blame, a number of problems occurred, the first came when I decided to rethink my idea, once I done that I had to change other components including my proposal.
Difficulty with the design specification and plan, the detailed plan was put on hold until the design specification is handed to the developer, as everything evolves around that task. The design specification is a lot more than I thought, as I knew I had to hand over the layout I wanted, but in order to do that I had to know the exact design in mind, shapes, styles, buttons etc. That’s taken a while.